ABEL CONSTRUCTION

4. Lancaster City Concrete Lagoon

Construction of this concrete lagoon was required for storm water management on the Lancaster’s NW Gateway project.  The lagoon was 25-feet wide and over 600-feet long, with a 10-inch thick slab and 3-feet high walls.  More than 40 ton of reinforcing steel and 600 CY of concrete were placed during the building of this structure.  A pumping station was also installed in order to outlet the lagoon.

Additional Info

  • Client: EDC Finance Corporation
  • Project Name: Lancaster’s NW Gateway
  • Location: Lancaster City, Lancaster County, PA
  • Contact: David Nikoloff (717) 397-4046
  • Start Date: May 2008
  • Completion Date: June 2009
  • Construction Costs: $875,000