This project involved the construction of a new four-span bridge, including the following items of work:  erosion and sedimentation controls, grading, storm drainage improvements, rip rap installation, 1900 L. F. of roadway and pavement markings. …
Construction on this project involved the replacement of two existing state-owned bridges over Big Beaver Creek.  One of the bridges is a two-span and the other a single-span, with both new structures being a composite…
This project involved the removal and relocation of the existing York County Bridge No. 64 structure to allow for construction of a new two-span, prestressed concrete spread box beam bridge with cast-in-place wingwalls.  The new…
Construction of this concrete lagoon was required for storm water management on the Lancaster’s NW Gateway project.  The lagoon was 25-feet wide and over 600-feet long, with a 10-inch thick slab and 3-feet high walls. …
This project involved the demolition and removal of an existing bridge, and the construction of a new three-span pre-stressed concrete box beam bridge and approaches.  After the old bridge structure was removed, the existing piers…
The scope of this project required Abel Construction to perform the demolition, removal and replacement of a single span concrete bridge adjacent to an existing historic office building.  Extra precautions were followed during the construction…